Projects
- Transportation Infrastructure
- Urban Transportation
- Rail Systems
- Motorways&Highways
- Ports and Airports
- Engineering Structures
- Junction Design
- Multi-level Interchanges
- Eng. Superstructures
- Buildings
- Hospitals
- Schools & Dormitories
- Shopping Zones
- Special Purpose
- Environmental Engineering
- Sanitation Projects
- Geodesy&Cadastre
- Energy Efficiency
- Energy Efficiency in Buildings
- Renewable Sources
- Green Building Certification
- Ongoing Projects
-
Fatsa Peripheral Highway
Survey & Design -
Ula - Cicekli Highway
Survey & Design -
TOKI Package-15
Consultancy Services -
Energy Efficiency Services for Ministry of Education
Consultancy Services -
Energy Efficiency Services for Public Buildings (Lot-2)
Consultancy Services
Ongoing Projects
Ula -Cicekli Highway
OPTİM OBERMEYER Proje Teknik Bilgi İşlem Merkezi A.Ş.
Client: General Directorate of Highways
Work Period: 02.04.2020 - ongoing
Services provided: Final design of the highway and the hydraulic structures, topographical and geological studies, EIA, preparation of the final report. The project covers topographical survey, geodesic modeling, geometrical design, hydraulic survey, crosssection drawings, design of retaining walls, cut-fill calculations, design of intersections and access ways, planprofile and details, drainage design, design of bridges, tunnel design, geological survey, hydra-geological survey, engineering geology survey, geotechnical design, superstructure design, traffic design, environmental impact assessment, quantity survey, preparation of the final report.
Technical Details: The project consists of rehabilitation design services for two highways in Ula region of Mugla where has a high touristic potential. First route begins at Ula junction on Mugla-Marmaris highway and ends at Ula-Armutçuk-Çiçekli intersection. The length of the route is 11,5 km with 3 intersections. Second route begins at Mugla-Kale intersection and ends at Mugla-Koycegiz intersection. The length of the route is 18 km with 4 intersections.