Devam Eden Projeler – Fatsa Çevreyolu

Ongoing Projects

Fatsa Çevreyolu Etüt ve Proje Mühendislik Hiz.

OPTİM OBERMEYER Proje Teknik Bilgi İşlem Merkezi A.Ş.

Client:              General Directorate of Highways

Work Period: 17.08.2017 - ongoing

Services provided:           Final design of the highway and the hydraulic structures, tunnel design, topographical and geological studies, EIA, preparation of the final report. The project covers topographical survey, geodesic modeling, geometrical design, hydraulic survey, crosssection drawings, design of retaining walls, cut-fill calculations, design of intersections and access ways, planprofile and details, drainage design, design of bridges, tunnel design, geological survey, hydra-geological survey, engineering geology survey, geotechnical design, superstructure design, traffic design, environmental impact assessment, quantity survey, preparation of the final report. 

Technical Details:    The project consists of new peripheral highway design services for Fatsa province of Ordu city. The length of the route is 22 km with 5 intersections, 5 tunnels (10623m) and 3 bridges.

en_USEnglish

Enter your keyword